We have finished the small section of wall which was left un-supported thinking they needed to back in truck for rock. I've made a video showing how we pounded in the rebar to hold the support against the formwork. You can see in the video how we did it also. We needed to pound in 142 of these rods into the lava rock. Suffice it to say, I don't want to see a sledge hammer for a while. We also put some wire mesh down where it will eventually go. It needs to be brought up 2 inches from the rock floor for one layer and then 6 more inches for the second layer.