The U shaped beam holders worked well. The beams needed a little encouragement to be installed. Sometimes with a sledge hammer and sometimes with a little hand planing. All in all, it went rather smooth. The operator stands beside us with a rope to manage the swinging of the beam. He has a nice remote control to deal with the whole show. Watch the video for more details.
Our TJI's and gluelam beams ready for us.
Hiltons Crane Service
Our first placement of the back 35 foot (10.6 meters) beam.
Beam in place.
Front beams, sit half on the post.
This is a 30 foot beam in place, another 24 foot one sits beside it.
Beams in place.
No comments:
Post a Comment