Sunday, December 12, 2010

Posts placement..

So we were out this morning trying our posts. We wanted to see if the orientation was good or not for our posts. The welds were complicated angles. So after setting them all up, the welders had made a mistake only on one. Its not a big issue since we will just rotate it a little and it will be inside our wall and no one will see it. However instead of 55 degree's it is only 30 degree's probably. We pulled a string our to see line up our orientation. The plan is to align them exactly using a string and then just mark where we need to drill our 5/6 inch holes in the concrete. Drill our holes then move the most back and bolt them down. The crane will lift the wood beams in place.






The back edge should be parallel with the concrete.

The back edge should be parallel with the concrete.

Posts where our kitchen will be.

The back edge should be parallel with the concrete.

All three kitchen/bathroom posts.

Comparing how the posts looks against a 2x6 beam, it will cover it up without any issue.

We will need to re-drill one of the holes.

No comments:

Post a Comment