Tuesday, December 21, 2010

Tank work..

So, to stay out of the rain we spent most of the day removing materials from the tank. I think the work done in the North Koren forced labour camps are eaiser, no joke. Some highlights.. Cockroaches, lots of mosquitos, risk of ceiling collapse, 2x4's with exposed nails, limited height, 3cm of water, heat (warmer then outside for weird reason) and likely more. The prime tool for this work is our trustry Dewalt 36v Reciprocating saw. This tool is really for this kind of work. Its rough and quick cutting in this material. Ideal for demolition work, etc. It can cut wood, metal, nails, etc. The one good thing is our plywood sheets are stuck to the ceiling, so we don't need to deal with them falling down on us while we work away.





No comments:

Post a Comment