The concrete pour happened without any issue today. The truck arrived from Yamada at exactly 11am as scheduled and the whole show went on without a single hiccup. This is great news and everyone was much happier compared to what happened last time. My dad and I switched the vibration job back and fourth. It was a hell of tiring thing to pull the vibrator up and down. Its an awkward thing to manoeuvring and has some weight to it. Its also a loud machine as well. By the end of the vibration job the end was steaming from how hot it had become. Anyhow, we were plenty tired after doing that for two hours for sure.
Our overflow drain
Our tank floor drain pipe.
The upper slab pour will cover this rebar.