Saturday, February 26, 2011

Plumbing..

Sorry about the delay, the internet that we share from the neighbours hasn't been working all too well so I didn't get much chance to upload any new items.

I forgot to take pictures, because we were so busy with our plumber. We found a charming, very charismatic gentlemen who charges a reasonable amount. He's very knowledgeable. We would of course do the plumbing ourselves, however the local plumbing and electrical mafia don't allow that. The work is going well. We have pretty much all the drain/air venting plumbing done. Some of the water hookups are done as well.

They have a crazy rule here in Hawaii, which actually comes from California. All water/gas/drainage needs to be water/pressure tested. For the water and gas lines they use compressed air to test the system. For the drainage and air venting you need to fill all the drainage pipes to the roof vents, believe it or not. This is craziest plumbing situation I have ever heard of. It seems insane. You could never do this in Canada because in winter the pipes would free on the job site and burst by the time the inspector arrived there.


Notched our concrete for our air vent and bathroom sink drain.

Plumbing in ground before burial.

Gerry the plumber and my dad at work in the utility room.

Wall mounted toilet on left and wall mounted bidet on the right.

Most of the kitchen rough in work done. Gas line still needs to be put in.


Our ice maker box connection and where our tankless water heater will connect to.

Toilet and bidet rough in plumbing.

Shower drain.

Bathroom sink connections.

Plumbing work in our kitchen will have our sink, dishwasher, washing machine and dryer.

No comments: