Thursday, February 10, 2011

Pre-pour tank access setup..

So we worked setting up the stainless steel tank access door. We made sure it had a lip above the concrete so that any debris which would/will fall on top doesn't get blown into the tank.

Another step was to place the ground wire and connect it to the last piece of rebar directly connected to the whole tank. We will need this for our electrical box for grounding and so that the GFI feature works correctly for the appropriate plugs.


Copper ground wire connected to the rebar using brass connector.


We added some extra rebar to bridge the gap between new rebar we placed inside the opposite wall.